Saturday, September 18, 2010

Before and after so far - round 1

Keep in mind that these are halfway through the remodel pictures!  But don't you agree, it's already looking 100 times better?? :)

Bathroom door and south wall before
Bathroom and south wall after


Before, the inside of the bathroom was the same mint green color/old toilet - this is after
We also ripped up the old bathroom floor and installed new gray tiles as well as a brand new toilet




This is the north wall before - the AC unit is gone and a new system has been since put in
This is the north wall after


The in-wall wet station units were taken by the previous tenant, leaving gaping holes.  This is the station area before
The stops of the holes have been drywalled in so mirrors can be attached directly to the wall with no spaces whatsoever.  This is halfway through completion of the station area - post drywall


This was the east and south walls before
This is the south and east walls after - the east wall is now the slightly darker accent wall to add some depth


There is no backroom for storage or color mixing, so the east side of the back south wall is going to have a storage cabinet and back bar sink installed.  Here is the start of this


My Dad just finished my reception desk and it is AMAZING!  It will be nice and private and L shaped against the east wall.


The in wall wet stations are also being built.  They are about half done - pardon the dust.  Construction is messy work!  Mirrors will be placed above the bowls and on the wall behind the station.

I'll post more pictures as we go.  Again, I can't thank my Dad enough for the awesome construction he is doing on this equipment!  I hope everyone enjoys it as much as I do :)  Have a fabulous weekend, friends.

3 comments: